- HP,IP,LP turbine maintenance

-HP-IP-LP rotor assembly and disassembly activities

- HP-IP-LP diaphragm maintenance

- Main lube oil and Turning gear

- Packing box and seal labyrinth maintenance

- Inner and outer casing,hood alignment

- Turbine barrit bearing adjusment,deburing activities

- Replika & life analysis of ROTOR

-Sandblasting activities Rotor and all diaphragm

- Packing box labyrinth maintenance

- Oil deflector maintenance

- Casing and packing box-bearing Blue check, contact test activities

-Rotor bucket radial-axial clerance measurment and wire check-erag check act

- Crossover installation compansator maintenance

- Lube oil & lift oil system maintenance

- Main lube oil tank maintenance

- Replace new oil T32-VG32 and flushing activities

- Rotatary blade-Stationary blade maintenance

- STG Final alignment

- Pre comissioning & commissioning activities

- Vibration measurment and balancing control

- Balancing activities

- After turbine disassembly visual check

-Steam main stop and combined reheat valve maintenance