- HP,IP,LP turbine maintenance
-HP-IP-LP rotor assembly and disassembly activities
- HP-IP-LP diaphragm maintenance
- Main lube oil and Turning gear
- Packing box and seal labyrinth maintenance
- Inner and outer casing,hood alignment
- Turbine barrit bearing adjusment,deburing activities
- Replika & life analysis of ROTOR
-Sandblasting activities Rotor and all diaphragm
- Packing box labyrinth maintenance
- Oil deflector maintenance
- Casing and packing box-bearing Blue check, contact test activities
-Rotor bucket radial-axial clerance measurment and wire check-erag check act
- Crossover installation compansator maintenance
- Lube oil & lift oil system maintenance
- Main lube oil tank maintenance
- Replace new oil T32-VG32 and flushing activities
- Rotatary blade-Stationary blade maintenance
- STG Final alignment
- Pre comissioning & commissioning activities
- Vibration measurment and balancing control
- Balancing activities
- After turbine disassembly visual check
-Steam main stop and combined reheat valve maintenance