- Grout,fixator,chipping preparation
- Anchor bolt-gib key-center guide preparation-
- HP / IP/ LP turbine erection,
-STG valve(main stop,regülatör,admission,control,actuator and thermocouple)installation/
- Final alignment,
- Auxialry system installation (gland steam condenser,packing box-hydraulic unit
- Aircooler hot box installation
- Condenser and neck-expansion installation
-Generator setting and installation
- HP-IP-LP bucket axial&radial measurment and alignment
- Gland steamlabyrinth-packing box labyrinth ,damping wheel & bucket
- Lube oil-lift oil-hydraulic oil installation-
-Lube oil tank installation and piping activities including flushing