- Grout,fixator,chipping preparation

- Anchor bolt-gib key-center guide preparation-

- HP / IP/ LP turbine erection,

-STG valve(main stop,regülatör,admission,control,actuator and thermocouple)installation/

- Final alignment,

- Auxialry system installation (gland steam condenser,packing box-hydraulic unit

- Aircooler hot box installation

- Condenser and neck-expansion installation

-Generator setting and installation

- HP-IP-LP bucket axial&radial measurment and alignment

- Gland steamlabyrinth-packing box  labyrinth ,damping wheel & bucket

- Lube oil-lift oil-hydraulic oil installation-

-Lube oil tank installation and piping activities including flushing