Grout,fixator,chipping preparation –
- GTG installation including interconnection pipe installation
- Lube oil-Accessory skid-Fuel Skıd installation
- Turbine enclosure installation
-Air intake installation including cardrige and filter-
-Auxilary system installation(PEEC-PCC-LCI-H2 dryer,air compresor-accumulator regulator etc
- CO2 –fire fighting including pipe installation
- Diffuser &exhaust duct installation –
- GTG insulation activities-
-Heat tracing and insulation activities